Ofelia Bringas Memorial Bridge

9-17-10-CATHERDRAL-BRIDGE-OPTION-1-VIEW03[1]9-17-10-CATHERDRAL-BRIDGE-OPTION-1-VIEW03[1]
WHAT: 4 Lane Bridge Eliminating Low Water Crossing
WHERE: Over Whitewater River
WHEN: Planning Summer 2008
Preliminary Engineering & Environmental Clearance Spring 2012
Final Design Fall 2017
Start Construction Summer 2020
Complete Construction Fall 2022

PROJECT LINKS:

PROJECT BACKGROUND:

The project involves replacement of an existing 4-lane low water crossing with a new 4-lane all-weather bridge, approximately 650 feet long, over the Whitewater River on Cathedral Canyon Drive.

On March 27 Council awarded a contract for the grant-funded Date Palm sidewalk project and voted to name the new bridge on Cathedral Canyon as the Ofelia Bringas Memorial Bridge in recognition of her work for the youth of our community over many years.

BENEFITS:

During heavy rains, this low water crossing becomes impassable and is closed to through traffic, severing one of only two North/South connections between Cathedral City's downtown and the many residential and commercial neighborhoods north of the Whitewater River.

Construction of the bridge will allow traffic to cross the Whitewater River while storm waters flow below

Project Documents

Bridge Elevation Aesthetics
Bridge Elevation Aesthetics

Swift Water Rescue

Location:  Cathedral Canyon Drive over the Whitewater River

Applicant:  City of Cathedral City

Project Websitehttp://www.cathedralcity.gov/services/engineering/capital-projects/cathedral-canyon-bridge-project

Project Description: Replacing a low water crossing that is closed several time a year for flooding with a new bridge